Best landed cost.
Best-quality part.
Wherever it’s made.
Direct Line Partners is the sourcing agent that finds, qualifies, and manages factories in China and other countries for North American OEMs and product brands — with a quality system that stands between your PO and the production line, and a fee that only applies when you buy.
| Per unit | China | Alt. origin 12.5% duty | Alt. origin FTA, 0% |
|---|---|---|---|
| FOB price | $1.20 | $1.26 | $1.38 |
| Duty, per HTS code | $0.48 (40.0%) | $0.19 (15.0%) | $0.00 (0%) |
| Freight to your dock (Dallas here) | $0.06 | $0.07 | $0.03 |
| Landed cost | $1.74 | $1.52 | $1.41 |
| Our fee, 10% of FOB | — | $0.13 | $0.14 |
| All-in, fee included | $1.74 | $1.65 | $1.55 |
| Annual, all-in | $208,800 | $197,520 | $185,760 |
Built for buyers who already import — and know what's going wrong.
Most of the companies we talk to have a factory they found years ago, one person managing it part-time, and two years of tariff whiplash nobody re-quoted them through. We're the second source, the re-quote, and the inspection you've been meaning to set up.
Custom components for OEMs
You send drawings and annual volumes. We return DFM feedback, multi-origin quotes from named and audited factories, and a first-article plan. Tooling stays in your name.
Typical engagement: 3–12 part numbers, $100k–$2M annual FOB, engineering-owned specs, first PO within 16 weeks of re-quote.
Repeatable SKUs, private label
Spec sheets, golden samples, and reorders that arrive the way the sample looked. Three categories where consistency is the chronic complaint:
From your top five SKUs to a managed supply line in about sixteen weeks.
Every stage ends with a document you can hand to your CFO or your quality manager. Nothing moves to the next stage without it.
- You get: Landed-cost comparison, China and other countries, named factories
- You get: Audit report · signed NNN · UFLPA traceability file
- You get: FAI report · approved golden sample · tooling ownership letter
- You get: In-process + pre-shipment inspection reports · loading photos · customs docs
- You get: Monthly scorecard · quarterly origin review
See what origin does to your unit cost before you talk to anyone.
Enter one SKU. Defaults reflect tariff rates in effect as of September 26, 2026 for most product categories; every assumption is editable. Estimates only — Section 232 metal content and product-specific Section 301 lists change the answer, and we confirm those per HTS code in the re-quote.
Your SKU
Assumptions by origin
Landed cost per unit
| Per unit | China | Alt. origin A | Alt. origin B |
|---|---|---|---|
| FOB | |||
| Duty stack | |||
| Freight | |||
| Direct Line Partners fee (10% FOB) | |||
| Landed, all-in | |||
| Annual, all-in |
Defaults reflect rates as of September 26, 2026; the default SKU is a molded EPDM gasket on HTS 4016.93.50 (MFN 2.5%, List 3). Origins other than China are shown by duty treatment; the re-quote names the factory and the country. Not modeled: Section 232 duties on steel, aluminum and copper content (25–50%, any origin), anti-dumping/countervailing duties, MPF/HMF fees, tooling amortization, and the open second Section 301 (excess-capacity) investigation. The re-quote covers all of them per HTS code.
The inspection is the product. The factory is the vendor.
A low quote is easy to find. What you're paying us for is the system that makes the tenth reorder look like the golden sample — written down before the first PO, so nobody negotiates it after a bad shipment.
| Checkpoint | What happens | Standard |
|---|---|---|
| 01 Factory audit | On-site before any PO: capability, capacity, quality records, working conditions, sub-supplier list. | Photo report, 40-point checklist |
| 02 Golden sample / FAI | Approved sample locked and retained in three places: you, us, the factory. Engineered parts get a first-article report against the drawing. | FAI in AS9102 format, ballooned drawing |
| 03 In-process check | Inspection at 20–30% of the run, while a problem is still cheap to fix. | Dimensional + visual, sampled |
| 04 Pre-shipment inspection | Statistical sampling of finished goods before the container is loaded. You read the report before you release the shipment. | ANSI/ASQ Z1.4 · AQL 2.5 major / 4.0 minor default |
| 05 Loading supervision | Carton count, marking, container condition, seal number photographed. | Loading report + seal photo |
| 06 Defect remediation | Rework, replace, or credit — the sequence and the timelines are agreed in writing before the first PO. | Remediation policy in the supply agreement |
Every checkpoint, plus the compliance file that rides with each SKU →
Origin is now a design decision.
The tariff stack was rewritten twice in 2026. We don't pick a country for you: the same part is quoted from China and every viable alternative, and the landed cost decides — then we re-check it every quarter.
China Guangdong · Zhejiang · Jiangsu
- Deepest supplier bench on earth; fastest tooling and prototyping.
- Still the right answer for complex assemblies, electronics, and anything whose sub-supply chain lives there.
- UFLPA scrutiny is highest here — traceability is non-negotiable.
Alt. origin · 12.5% duty ocean transit like China
- MFN plus the 12.5% Section 301 rate (10% for some economies), with none of the China list rates on top.
- Strong in plastics, textiles and soft goods, furniture, electronics assembly, and light metal fab; 30–45 days on the water, like China.
- Watch item: the second Section 301 (excess-capacity) investigation, open since March 2026 across 60 economies.
Alt. origin · FTA, 0% truck freight, days not weeks
- Truck freight in days instead of 30–45 on the water; no ocean schedule risk; small-lot flexibility.
- Machining, stamping, injection molding, wire harnesses, assemblies; higher labor cost offset by zero duty.
- Rule of origin checked per part, never assumed — a part that fails it pays MFN + 10%. Section 232 still applies to metal content.
One number. It only applies when you buy.
- No retainer, no setup fee, no minimum commitment.
- The 10-day re-quote is free, with no obligation to proceed.
- Includes sourcing, audits, samples, in-process and pre-shipment inspection, loading supervision, and documents.
- Lab testing and certification fees pass through at cost, invoice attached.
Start with us, and we'll over-deliver on purpose.
- Sample and first-article coordination on your first three part numbers at no fee.
- Priority engineering time — DFM reviews inside five business days.
- Quarterly origin and tariff review for the first two years, not one.
- Direct line to a founder, in your time zone, for the life of the account.
Straight answers before the call.
Do you take title to the goods?
No. We are your sourcing agent, not a trading company. You contract with the factory, you pay the factory, you are the importer of record. Our fee is separate and visible. That’s why the FOB price on our quote is the real one — there’s no margin hidden inside it.
Who owns the tooling?
You do. Molds, dies, fixtures and gauges are titled to you in the supply agreement, with a documented transfer procedure if you ever move the work — to another factory, another country, or in-house.
What’s the minimum program size?
There’s no hard minimum, but the fee only makes sense for both of us above roughly $25,000 in annual FOB per part family. Below that we’ll tell you so in the re-quote and point you at a better option.
How do you protect our drawings and IP?
NNN agreements (non-disclosure, non-use, non-circumvention) executed in the factory’s jurisdiction and language before any drawing is shared; controlled access with revision tracking; sensitive assemblies split across suppliers where it makes sense; and no factory sees your customer’s name.
What about steel and aluminum parts?
We model Section 232 up front and say so plainly when the metal content makes offshore sourcing a wash. Since June 8, 2026 it applies from every origin — 50% on articles essentially all steel, aluminum or copper, 25% on derivatives — so for fabricated metal an origin with truck freight to your dock often wins on lead time and lot size even where the duty is equal; sometimes the honest answer is to stay domestic. You’ll get that answer in the re-quote, free.
Can you work with our existing factory?
Yes, and often that’s the first project: audit them, put the inspection plan around them, and qualify a second source alongside. Most existing suppliers get better when they know someone is checking.
Send us your top five SKUs. Get every viable origin back.
No commitment. In ten business days you’ll have a landed-cost comparison you can put in front of your CFO, with named factories behind every number.