How to run a part through a landed-cost calculator — and the five things it can't tell you
A landed-cost calculator sorts parts in minutes: twelve inputs, one per-unit table, one verdict. What each input means, where your number comes from, and the five things it cannot know, from HTS class to defect cost.
A landed-cost calculator tells you, in a few minutes, whether a part is worth re-quoting. It cannot tell you whether the move will work, because the five facts that decide that are not inputs it can check.
This post walks through every input on our landed-cost calculator, where your number for each comes from, and how to read the result, then the five things no calculator knows. The method the calculator is built on, four lines from FOB to the agent fee, is in the landed-cost guide for importers, 2026 edition. Its tariff defaults are the rates as of September 26, 2026.
The inputs, and where your numbers come from
The calculator opens with the gasket from our worked example already loaded: a molded EPDM gasket on HTS 4016.93.50, MFN 2.5%, Section 301 List 3. Its rates are as of September 26, 2026, and on a real quote they are confirmed per HTS code. Replace each default with your own figure, in this order.
| Input | Default | Where your number comes from |
|---|---|---|
| Current FOB unit price (China), USD | 1.20 | Your latest PO or the factory’s commercial invoice |
| Annual quantity | 120,000 | Twelve months of receipts, or the forecast you budget on |
| MFN duty rate, % | 2.5 | The Column 1 General rate for your 8-digit HTS code in the HTSUS |
| China: added tariff, % | 37.5 | 25 list rate plus 12.5 for Lists 1–3; 20 for List 4A; 12.5 if unlisted |
| China: freight per unit, $ | 0.06 | Door-to-door lane cost divided by the units that fit |
| Alt. origin A: FOB vs. China | 1.05 | A multiplier on your China FOB; 1.05 means 5% higher |
| Alt. origin A: added tariff, % | 12.5 | 12.5 for most economies under the July 24 Section 301 tariff, 10 for the rest |
| Alt. origin A: freight per unit, $ | 0.07 | Ocean lane, priced like China’s |
| Alt. origin B: FOB vs. China | 1.15 | A multiplier; 1.15 means 15% higher |
| Alt. origin B: tariff if the part fails the rule of origin, % | 10 | Added to MFN when the box below is unchecked |
| Alt. origin B: freight per unit, $ | 0.03 | Truck lane from an origin within truck range of the US |
| Origin B qualifies under a free-trade agreement | Checked | Checked means 0%: MFN waived, no Section 301 |
Origin A is a 12.5% origin; origin B is an FTA-qualifying one.
The freight inputs are per unit, not per container. If all you have is a container rate, convert it first: divide the door-to-door lane cost by the units that fit, checking both cube and weight.
Reading the result
The calculator applies duty to FOB value. For each origin it shows FOB, the duty stack in dollars and as a percentage, freight, our fee at 10% of FOB, landed all-in per unit and annual all-in. Your current China cost carries no fee; every alternative does, so the comparison is against what you pay today.
At the defaults, China lands at $1.74, $208,800 a year. Origin B lands all-in at $1.55, and the summary reads $23,040 a year, 11.0% lower per unit after the fee. If no alternative beats your current cost, the summary says “China still wins”.
Then untick the rule-of-origin box. Origin B’s duty jumps from 0% to 12.5% (MFN 2.5% plus 10), its all-in cost rises to about $1.72, and it falls behind origin A. That one checkbox is worth most of the saving, which is why it is the second thing on the list below.
Now load the enclosure from the guide, with its illustrative inputs: $2.10 FOB, MFN 5.3%, China added tariff 20 for List 4A, China freight $0.14, origin B at about 1.17 times China’s FOB with $0.05 freight. China lands at $2.77; origin B lands all-in a couple of cents lower. The calculator reports a saving under 1%, which is a stay.
An alternative 10% or more below your current cost is worth a re-quote. Within 5%, lead time, MOQ and risk decide, not price. Below that, keep the factory you have.
One: the true HTS classification, and whether a List rate applies
The calculator takes your MFN rate and your China added tariff as given. Both come from the 8-digit HTS code, and if the code is wrong, every number after it is wrong.
Codes get inherited from an old entry or a similar SKU. The same code decides whether the China column carries 25 points of list rate, 7.5 or none, and on the gasket the 25-point list rate is worth 30 cents a unit, more than the 18-cent spread in factory prices across China and both alternatives. Before you trust the result, ask your broker to confirm the heading and its Section 301 list status in writing. The step-by-step is in how to read your tariff stack by HTS code.
Two: whether the part is a Section 232 derivative
The calculator does not model Section 232. Since June 8, 2026, an article essentially all steel, aluminum or copper pays 50% on its full customs value, and a derivative substantially made of those metals pays 25%, at any origin. Section 232 goods do not also pay the 12.5% or 10%, and an FTA waives MFN but not Section 232. Parts under 15% metal content are exempt.
For a metal part, the calculator’s answer is the wrong shape. The duty gap that made the gasket move nearly vanishes, and the decision moves to FOB, freight and lead time. Check metal content by weight on the factory’s bill of materials; over 15%, work the part on a sheet instead, as in the June 8 Section 232 metals reset.
Three: whether the part actually qualifies under the FTA
The checkbox is an assumption. Whether a part earns the 0% depends on the rule of origin for its heading, checked per part against where its materials come from and what processing happens at the factory. An address inside an FTA partner proves nothing.
A part that fails pays MFN plus 10% as of September 26, 2026, and as the unticked box showed, that can turn the best origin into the second. Run every FTA-qualifying candidate both ways. If the move only works with the box checked, the rule-of-origin check is the first thing to settle, not the last.
Four: the factory’s real FOB, not a multiplier
The multipliers 1.05 and 1.15 are the gasket’s pattern, not a law. A real quote moves with the factory’s MOQ, its lot size, its tooling terms and its read of your drawing. Two factories in the same province can quote far apart on the same drawing.
Raise the multipliers and watch the gap. If it survives a higher FOB than you expect, a real quote will probably not erase it. If it disappears at 1.20, you have learned that the part depends on a price you do not have yet. The re-quote replaces the multiplier with a named factory’s FOB, plus the MOQ and lot size behind it.
Five: what defects cost
The calculator assumes every unit that lands is good. A part that fails at your dock costs the FOB, duty and freight you already paid, plus sorting, returns and whatever it stopped on your line.
Suppose, as an illustration, 2% of a $2.00 part fails incoming inspection. The good units now carry the bad ones: about 4 cents each, before labor and downtime. On the gasket, that is more than the whole freight difference between China and the FTA-qualifying origin.
Defect cost is controlled at the factory, through a golden sample, first-article inspection and AQL pre-shipment inspection to ANSI/ASQ Z1.4, not at your dock. What that inspection plan covers is on the quality and inspection page.
The calculator also leaves out anti-dumping and countervailing duties, the Merchandise Processing and Harbor Maintenance Fees, tooling amortization, inventory carrying cost in transit and the outcome of the open second Section 301 investigation. The re-quote covers each per HTS code.
What to do with this
- Run your top five parts by annual spend with real FOB, quantity and MFN rate, and the China added tariff set by list.
- Run every FTA candidate with the box checked and unchecked, and every part over 15% metal content on a sheet with Section 232 instead.
- Push the multipliers up until the gap closes. The multiplier at which it closes is the FOB a real quote has to beat.
- Send the parts that clear 10% for a real quote. Classification, rule of origin, named-factory FOB and the inspection plan are what the ten business days settle; how they are spent is on the process page.
Try your own numbers in the landed-cost calculator, then send us the five SKUs you’d most like re-quoted. Ten business days, no fee.