Freight per unit, not per container: how transit time and lot size change landed cost
A container rate is not a freight cost until it is divided by the units that fit, by cube and by weight. How to cost freight per unit, where LCL beats a full container, and what transit days and lot size cost in cash.
Freight belongs on a landed-cost sheet as a cost per unit, worked out from the units that actually fit in the box, not as a container rate copied from a forwarder’s email. The days the goods spend in transit and the size of each lot cost money too, and that cost never appears on a freight invoice.
This post covers how to turn a lane rate into a per-unit figure, where shipping less than a container beats filling one, and how to price transit time, safety stock and lot size. The full four-line method, from FOB through the agent fee, is in the landed-cost guide for importers, 2026 edition. Every figure below is an illustration in round numbers, except the gasket’s, which come from our worked example.
Divide by the units that fit, by cube and by weight
A container rate is a price for a box; the sheet needs a price for a part. The box runs out in one of two ways: it fills up, or it gets too heavy.
Light, bulky goods run out of cube first. Dense goods, metal parts especially, run out of weight first, and the container ships with empty space you are still paying for. Work out both limits from the carton: units per carton, carton dimensions, carton gross weight. Whichever limit binds first sets the units per container.
Suppose a 40-foot container costs $5,000 door to door and holds 1,000 cartons by cube.
| Illustrative | Units per carton | Cartons that fit | Binding limit | Units per container | Freight per unit |
|---|---|---|---|---|---|
| Small molded part | 100 | 1,000 | Cube | 100,000 | $0.05 |
| Bulky enclosure | 5 | 1,000 | Cube | 5,000 | $1.00 |
| Dense steel part | 20 | 400 | Weight | 8,000 | $0.63 |
The steel part’s freight is two and a half times what the cube alone suggests, because the container hit its weight limit with 60% of its space empty. Metal parts are also where the June 8 Section 232 reset has flattened the duty gap between origins, so freight and lead time carry more of the decision; the reasoning is in the June 8 Section 232 metals reset.
The per-unit figure covers everything between the FOB point and your dock: the ocean or truck leg, insurance, terminal handling, drayage, and the Merchandise Processing Fee (0.3464% of value, capped) and Harbor Maintenance Fee (0.125%, ocean only) collected at entry. In the gasket example, freight to Dallas comes to $0.06 a unit from China, $0.07 from a 12.5% origin and $0.03 from an FTA-qualifying origin within truck range of the US.
Freight per container instead of per unit is one of the quote-comparison mistakes in FOB vs. landed cost; the fix is carton data with every quote.
Less than a container, or a full one
Less-than-container-load (LCL) freight is priced per cubic meter, with minimums and handling at a consolidation warehouse at both ends. Full-container-load (FCL) freight is a flat price for the box, full or not. Between them is a break point.
Suppose LCL costs $150 per cubic meter all-in on a lane and a 20-foot container costs $3,000 door to door. The break point is 20 cubic meters, the container price divided by the LCL rate.
| Illustrative shipment | LCL at $150 per m³ | 20-ft container at $3,000 | Cheaper |
|---|---|---|---|
| 8 m³ | $1,200 | $3,000 | LCL |
| 20 m³ | $3,000 | $3,000 | Even |
| 26 m³ | $3,900 | $3,000 | Full container |
Below the break point, LCL is cheaper per unit even with the extra handling. Above it, the full container is cheaper even if part of it ships empty. LCL also adds days, because the goods wait to be consolidated and then wait again to be unpacked.
Truck lanes have the same split, partial load against full truckload. Find the break point for each lane and re-check it whenever the lot size changes.
Transit time is working capital
Goods in transit are inventory you have paid for and cannot sell. On deposit-and-balance terms, where the balance is due before the goods leave the factory, the clock starts at loading or earlier and stops when the goods are on your shelf.
The illustrative formula is simple:
carrying cost of transit = inventory value × annual cost of capital × transit days ÷ 365
Use the annual value of goods moving through the lane. Times transit days over 365, that is the average value in transit at any moment.
Suppose a program of $150,000 a year at FOB and a 12% cost of capital. Ocean freight at 42 days door to door: $150,000 × 12% × 42 ÷ 365, roughly $2,000 a year. Truck freight at 5 days: $150,000 × 12% × 5 ÷ 365, roughly $250 a year.
That difference, about $1,800 a year, is a little over 1% of the program. It does not move a part by itself, but it repeats every year and adds up across SKUs. The landed-cost calculator leaves inventory carrying cost out, so add it to the result by hand.
Safety stock follows the variance, not the average
Safety stock covers how late the goods can be, not how long they usually take. A lane that is long but predictable needs less buffer than a shorter lane that slips.
Suppose the ocean lane above can run two weeks late and the truck lane one week late. On $150,000 a year, a week of demand is about $3,000 of inventory, so the buffer is about $6,000 for ocean and $3,000 for truck. At 12%, that is roughly $700 a year against $350.
Unlike transit stock, safety stock never turns over; it is cash parked for as long as the program runs.
Lot size: a quarterly container or a monthly truck
Cycle stock is the inventory a lot creates while it is used up. On average it is half the lot. Ocean economics push toward full containers and large, infrequent lots; an origin within truck range of the US can ship smaller lots more often, if the factory’s MOQ allows it.
Put the three kinds of stock together for the same illustrative program:
| Illustrative: $150,000 a year at FOB, 12% cost of capital | Ocean, quarterly container | Truck, monthly release |
|---|---|---|
| Transit days | 42 | 5 |
| Average value in transit | ~$17,000 | ~$2,000 |
| Average cycle stock (half a lot) | ~$19,000 | ~$6,000 |
| Safety stock | ~$6,000 (two weeks) | ~$3,000 (one week) |
| Cash tied up | ~$42,000 | ~$11,000 |
| Carrying cost at 12% | ~$5,000 a year | ~$1,300 a year |
The gap is about $3,700 a year, roughly 2.5% of the program’s FOB value, and about $31,000 of cash released once. Two things offset it. Smaller lots cost more freight per unit, because a monthly partial load is priced less efficiently than a quarterly full container. And the factory’s MOQ may set the lot size whatever the freight math says.
Compare that 2.5% with the duty line. As of September 26, 2026, a China-origin part on a Section 301 List 1–3 heading pays MFN plus 37.5 points, and the same part from an FTA-qualifying origin pays 0%. On the gasket, confirmed per HTS code, that is 48 cents of duty against none on a $1.20 part. A 12.5% origin ships by ocean like China, so its transit and lot-size costs barely differ from China’s; duty is what separates them.
So working capital rarely decides a part alone. It decides ties: when two origins land within 5% of each other, lot size, transit days and cash tied up are the honest tie-breakers. Whether truck range is worth a higher FOB is the nearshoring question, and it gets answered with these lines, not a rule of thumb.
What to do with this
- Build freight per unit from the carton. Units per carton, dimensions and gross weight; check whether cube or weight binds; divide the door-to-door lane cost by the units that fit.
- Find the LCL and full-container break point for each lane, and the partial and full truckload one if you truck. Re-check it when lot sizes change.
- Put cash tied up on the sheet: transit stock, cycle stock and safety stock, each times your cost of capital. Add it to the calculator’s result by hand.
- Use it to break ties, not to make the case. A re-quote lists the lane, mode, transit days and lot size behind every freight figure; how that fits into the ten business days is on the process page.